Generation-Shift-Factors-Contingency-Analysis-Power-Flow-Study-AC-vs-DC-Methods
The project required the computation of the generation shift factors (GSF) based on a defined generator bus outage using the fast-decoupled XB version. The GSF values were used to approximate the post-contingency branch flows based on a pre-contingency branch flow and the generator output before the contingency. The AC power flows were compared with the DC method for the MW and MVA flows. Source
- 5
- MATLAB
- 16 mo ago